NV Energy has tapped Stanley Consultants to perform owner’s engineering for the Dry Lake Solar photovoltaic solar project. The 150-MW Dry Lake solar project will be located 20 miles northeast of Las Vegas in a designated federal solar energy zone. It includes a battery storage system capable of storing 400 MWh and delivering 100 MW…

The post 150-MW solar project planned on federal land in Nevada appeared first on Solar Power World.

Leave a Reply